Brands that trust us as their stand builder
What your VETECO stand needs depending on windows, solar protection, glass or software
According to IFEMA figures, 34% of visitors are workshops and installers and 28% are developers, contractors and renovation firms. They come to touch, compare and decide, so the stand needs full-scale product.
Windows and facades
Profile sections and corners at full size, with the window working so it can be opened and closed.
Solar protection
Blinds, awnings and pergolas mounted and motorised, with power planned for the demonstration.
Glass
Well-lit glazing samples, with supports calculated for the weight of the glass.
Software and BIM
Demo stations with a screen and seats, and a meeting area for architecture studios.
IFEMA rules for building a free-design stand at VETECO 2026
The VETECO 2026 exhibitor guide is public and sets build-up dates, heights, solid walls and second floors. These are the four figures that shape the stand design most.
See all 8 rules, with their source
| Build-up (free design) | 1 to 7 November 2026: 1 and 7 from 08:30 to 19:30 and 2 to 6 from 08:30 to 21:30. Goods and decoration material come in on 8 and 9 November, and dismantling is on 14, 15 and 16. source |
|---|---|
| Project | Uploaded to the Zona Expo for approval before 1 October 2026, with plan and elevations. Build rights have a 5% discount until that date and a 25% surcharge from 23 October. source |
| Rigging | If the project has elements hung from the ceiling, the hanging points must be booked with the fair and a separate rigging project sent to IFEMA before 1 October 2026. source |
| Height | 4 m along the perimeter. To raise or hang decorative elements up to 6 m, set back 1 m around the perimeter. Not available in the connection areas between halls or on the entrance sides of Halls 9 and 10. source |
| Overhangs | Construction, decoration and spotlights may not project more than 50 cm beyond the allocated space, and only from 2.5 m high. Spotlights point towards the inside of the stand. source |
| Solid walls | At most 50% of each aisle frontage. Longer closures are set back 3 m and cannot exceed 80% of the frontage length. source |
| Second floor | Up to 7 m in halls, set back 1 m around the perimeter and not allowed in the connection areas or on the entrance sides of Halls 9 and 10. A document with dimensions, working load and capacity is required. source |
| Safety and access | Hard hat, high-visibility vest and safety footwear are compulsory during build-up and dismantling. Every company builds at least the party walls with the hall wall and neighbouring stands, and submits the occupational risk protocol. source |
Source: VETECO 2026 Exhibitor Guide and Specific Participation Rules (IFEMA MADRID, in Spanish), consulted 2026-10-07. Confirm against the current version.
Designing a VETECO stand with full-scale samples and product people can test
Free-design build-up starts on 1 November and lasts seven days, with long hours. So we fix the samples, the demo power and the open frontage in the first sketch.
Full-scale samples
Profile sections, corners and glass at full size, on supports calculated for their weight and well lit.
Product that works
Windows that open, blinds that rise and doors that operate, with power and cabling planned from the drawing.
Frontage open to the aisle
Solid closures cannot exceed 50% of each frontage: glass fronts and product that invites people in.
Build-up with margin
We arrive with a prefabricated stand and install between 1 and 7 November, with no improvising in the hall.
Do you have a plot at VETECO?
Tell us what product you show and how much must work on the stand. We come back with a 3D proposal and a quote.
Stands we have already built and installed, including those for FAE, Tyton and TT Cables
More stand projects in our portfolio.
What costs most in a VETECO stand with full-scale window samples
We do not give figures without seeing your plot: the cost of a VETECO stand depends on the metres, the weight of the samples and how much product works. These are the six factors.
Heavy samples
Glass and profile at full scale need reinforced structure and supports to be shown safely.
Product in motion
Motorised blinds and doors need power, cabling and a repeatable demo throughout the show.
Glass frontage
Open fronts with glass and good light raise the finish cost, but they draw visitors in.
Height and second floor
Going above the general height needs a set-back, more structure and documentation.
Rigging
Hanging the brand or product goes through a separate project and booked hanging points.
Seven-day build-up
A stand built in the workshop needs fewer hours in the hall and avoids delays.
At Contemporanea Eventi we design and build your VETECO stand
Tell us what product you show, how much must work on the stand and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at VETECO.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Common questions from anyone showing windows, facades or glass at VETECO
The questions that come up most when preparing a free-design stand at IFEMA Madrid, answered with the 2026 exhibitor guide, so dates and deadlines are those of that edition.
When is VETECO 2026?
On 10-13 November 2026 at IFEMA Madrid: 10 to 12 from 09:30 to 18:30 and on the 13th until 16:00.
What is the International Construction Week?
The joint event of CONSTRUTEC, VETECO, SMARTDOORS and PISCIMAD, which IFEMA holds on the same dates and at the same venue, with its own congress.
How much does a VETECO stand cost?
It depends on the plot, the samples and the product that works, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Can I build a two-floor stand?
Yes, up to 7 m in halls, with the upper floor set back 1 m. Not in the connection areas or on the sides of Halls 9 and 10.
Can I close my stand with walls?
Up to 50% of each aisle frontage. To close more, set it back 3 m and do not exceed 80% of the frontage.
Until when can the project be uploaded?
In 2026 the deadline was 1 October. For the next edition, start with months to spare and review the steps to organise a trade show in advance.
Installing your VETECO stand in the IFEMA Madrid halls
We take the finished stand from Barcelona to IFEMA Madrid. We install and dismantle it ourselves, within IFEMA's hours.






