Brands that trust us as their stand builder
What your SiGMA Malta stand needs depending on whether you are an operator, platform provider, affiliate or payments service
At SiGMA Europe the talk is of licences, product and volume. Malta is where licensing conversations happen, so the stand has rooms to talk in private and a clear demo.
Operators and licensees
A meeting place with privacy, with a table to talk licences and product.
Platform and software
A product that must be demonstrated well: demo stations with a stable connection and seats.
Affiliates and lead generation
The metric is conversations per day: open front, bar and little barrier to the aisle.
Payments, legal and compliance
Long, detail-heavy conversations: an insulated room with a table for contracts.
Designing a SiGMA Malta stand with an open front, screen demos and private rooms
In iGaming you sell with a demo and a conversation. So we design an open front to catch passing traffic, comfortable demo stations and rooms to talk licences without being overheard.
Open front
A bar or counter on the aisle, with little barrier and a brand readable from afar.
Demo stations
Screens with a stable connection and seats, to show the product in a few minutes.
Private rooms
Insulated rooms with a table to negotiate licences and contracts, away from the noise.
Brand from afar
Height and light designed so the stand is seen above the rest.
Planning to exhibit at SiGMA Malta?
Tell us which product you present and how many meetings you expect. We come back with a 3D proposal and a quote.
A sample of our trade show work with Upgaming, Paybrokers and NGX
More stand projects in our portfolio.
Which factors raise the cost of a SiGMA Malta stand with demos and private rooms
We do not give figures without seeing your plot: the cost of a SiGMA Malta stand depends on the metres, the rooms and transport to the island. These are the six factors.
Demo stations
Every connected screen adds equipment, cabling and seats planned from the drawing.
Private rooms
Every insulated room adds structure and reduces the open surface of the stand.
Transport to the island
Reaching Malta adds shipping, customs planning and a short build-up window.
Light and screens
Large screens and their own light add power and control throughout the show.
Brand height
Raising the brand above the general height needs calculation and the organiser's approval.
Reusing the stand
A modular design pays off if you return to SiGMA or take the stand to other iGaming shows.
At Contemporanea Eventi we design and build your SiGMA Malta stand
Tell us which product you present, how many rooms you need and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at SiGMA Malta.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at Malta
Meet the team that designs, builds and installs it.
Questions from SiGMA Malta exhibitors about their stand and build-up on the island
The questions that come up most when preparing a stand in Malta. The technical rules are given to exhibitors by the organiser, so deadlines and heights are confirmed with them.
When is SiGMA Malta 2027?
On 3-5 May 2027 at the Malta Fairs & Conventions Centre, per the SiGMA website.
How does the stand reach Malta?
We produce it in Barcelona and ship it to the island; transport and customs are planned from the design stage, within the conditions set by the SiGMA organisers.
How much does a SiGMA Malta stand cost?
It depends on the plot, the rooms and transport to the island, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Where are the build rules?
In the technical rules the organiser gives each exhibitor. They are not public, so we ask the client for them before closing the design.
Can I build a two-floor stand?
It depends on the location and on the approval of the organiser and the venue, which set height, documents and deadlines. We confirm it before drawing the second floor.
When should I start designing?
With months to spare, because transport to the island adds lead time. See the steps to organise a trade show in advance.
From the Barcelona workshop to the build-up of your SiGMA Malta stand at the MFCC
We build the stand in our Barcelona workshop and take it to Malta. We install and dismantle it ourselves, within the organiser's hours.






