Brands that trust us as their stand builder
What your MCE stand needs depending on heating, air conditioning, water or renewables
Per its official website, MCE gathers installers, designers and distributors who compare equipment. The stand must show the unit, let people see how it works and offer a place to talk about the installation.
Heating and heat pumps
Units shown with a cutaway to see the inside and a running demo with planned power.
Air conditioning and ventilation
Equipment running with noise control in view, because visitors judge it by sound.
Water and plumbing
A demo with a real supply and drain, and pipe and fitting samples within reach.
Renewables and controls
Screens showing performance over a season, which no stand can show another way.
Designing an MCE stand with units on show, a working demo and a room for the installer
The installer buys what they understand and can fit. So we show the unit and its inside, build a demo with real services and give a place to talk about the installation.
Unit in view
Equipment with a cutaway or open panel, to see inside and understand how it is fitted.
Demo with services
Water, drain and power planned from the drawing, so the demo really works.
Noise control
A closed front for noisy equipment, so the conversation can be heard.
Installer's room
A table with sheets and samples to talk about the job, the schedule and the service.
Planning to exhibit at MCE?
Tell us which equipment you present, how much it weighs and which services it needs. We come back with a 3D proposal and a quote.
A sample of our trade show work with Amador Varas, Sepro and Edwards
More stand projects in our portfolio.
What weighs on the budget of an MCE stand with equipment on show and a demo with services
We do not give figures without seeing your plot: the cost of an MCE stand depends on the metres, the weight of the equipment and the services the demo needs. These are the six factors.
Weight of the equipment
Large units need a reinforced floor, supports and handling with a crane or forklift.
Demo services
Water, drain and power planned from the drawing add installation and coordination with the venue.
Cutaways and models
A unit cut open to be seen inside adds fabrication and finishes.
Installer's room
Every insulated room adds structure and reduces the open surface of the stand.
Transport and build-up
Producing in Barcelona means planning transport to Milan and a short build-up window.
Height and second floor
Going above the general height needs the approval of the organiser and the venue.
At Contemporanea Eventi we design and build your MCE stand
Tell us which equipment you present, how much it weighs and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at MCE.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at Fiera Milano Rho
Meet the team that designs, builds and installs it.
What MCE exhibitors ask about building their stand in Milan
The questions that come up most when preparing a stand at Fiera Milano. The technical rules are given to exhibitors by the organiser, so deadlines and heights are confirmed with them.
When is MCE 2028?
On 7-10 March 2028 at Fiera Milano, Rho. It is biennial, in even years.
Which sectors does MCE cover?
Heating, air conditioning, ventilation, water, plumbing and renewables, per the show website.
How much does a MCE stand cost?
It depends on the plot, the weight of the equipment and the demo, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Where are the build rules?
In the technical rules the organiser gives each exhibitor. They are not public, so we ask the client for them before closing the design.
Can I build a two-floor stand?
It depends on the location and on the approval of the organiser and the venue, which set height, documents and deadlines. We confirm it before drawing the second floor.
When should I start designing?
With months to spare, because the show’s rules set their own deadlines. See the steps to organise a trade show in advance.
Production in Barcelona and build-up of your MCE stand at Fiera Milano Rho
We build the stand in our Barcelona workshop and take it to Fiera Milano Rho. We install and dismantle it ourselves, within the organiser's hours.






