Brands that trust us as their stand builder
What your MEDICA stand needs depending on devices, diagnostics, health IT or clinical equipment
MEDICA gathered in 2025 some 4,800 exhibitors and 78,000 visitors. Visitors compare equipment and ask for data, so the stand needs clear demos and a room to talk privately.
Devices and equipment
Equipment shown in use, on safe supports and with room for the clinician to try it calmly.
Diagnostics and lab
Demo stations with clean light and easy-to-clean surfaces, and the data sheet next to them.
Health IT and digital
Screens with real cases and stable connection, and seats to see the full workflow.
Purchasing and distribution
Insulated meeting rooms to talk contracts and tenders, away from the aisle.
Messe Düsseldorf technical guidelines that shape a MEDICA stand with rooms and two storeys
The MEDICA 2026 exhibitor manual belongs to the organiser. These are the Messe Düsseldorf technical guidelines, common to its shows, and will be confirmed with the fair’s manual.
See all 5 rules, with their source
| Height | Height limits appear in a table by hall: in Hall 6 it reaches 8 m and for stands next to the gallery, 6 m. Walls over 4 m are dimensioned and calculated. source |
|---|---|
| Plan approval | Two-storey stands, special constructions and podiums over 20 cm need, six weeks before build-up, a structural analysis, a description and scaled plans with an escape route plan. source |
| Two storeys | They are authorised only to a limited extent and with the venue’s consent, requested on receiving the stand permit. They are not built on the first floor of Hall 6.1 or in Halls 7.0 to 7.2. Each storey has a minimum clear height of {A(DT, ‘2.5 m’)}. source |
| Party walls | If the back sides face a neighbouring stand and exceed 2.5 m, they are neutral in colour and carry no advertising. With an open or transparent upper floor the neighbour’s permission is needed. source |
| Advertising towards neighbours | Advertising aimed at a neighbouring stand keeps a minimum distance. Movable parts of displayed vehicles may not protrude into the aisle. source |
Source: Messe Düsseldorf technical guidelines (2023 version), consulted 2026-10-07. Confirm against the MEDICA manual.
Designing a MEDICA stand with medical device demos, private rooms and documents in time
At a health fair the demo and confidentiality weigh the same. As a second floor needs documents six weeks before build-up, we decide the rooms and structure early.
Equipment in use
Every piece of equipment working, with power and connection planned from the drawing, and calculated supports.
Clean surfaces
Materials and finishes that are easy to clean, with light that does not dazzle during the demonstration.
Rooms with privacy
Insulated rooms to talk contracts and patient data without it being heard outside.
Second floor if needed
With the venue's consent, a calculated structure and enough clear height on each storey.
Planning to exhibit at MEDICA?
Tell us what equipment you present and how many meetings you expect. We come back with a 3D proposal and a quote.
Shows where we have already worked with brands like Active Concepts, K-Pharm and EVA Pharma
More stand projects in our portfolio.
What weighs on the budget of a MEDICA stand with product demos and private rooms
We do not give figures without seeing your plot: the cost of a MEDICA stand depends on the metres, the equipment in use and the rooms. These are the six factors.
Equipment in use
Every piece of equipment working adds power, connection and supports, and demands easy-to-clean finishes.
Private rooms
Every insulated room adds structure and reduces the open surface of the stand.
Two storeys
They need consent, a stability calculation and a minimum clear height on each storey.
Screens and data
Screens with real cases need a stable connection and a design that does not dazzle.
Transport and build-up
Producing in Barcelona means planning transport to Düsseldorf and a short build-up window.
Reusing the stand
A modular design pays off if you return to MEDICA or take the stand to other health shows.
At Contemporanea Eventi we design and build your MEDICA stand
Tell us what equipment you present, how many rooms you need and whether you want a second floor. We come back with a 3D proposal and a quote for your stand at MEDICA.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at Messe Düsseldorf
Meet the team that designs, builds and installs it.
Questions from MEDICA exhibitors about their stand and build-up in Düsseldorf
The questions that come up most when preparing a stand at Messe Düsseldorf, answered with its technical guidelines, until the MEDICA 2026 manual is confirmed.
When is MEDICA 2026?
On 16-19 November 2026 at Messe Düsseldorf.
What were the figures of MEDICA 2025?
Per the MEDICA website, 4,821 exhibitors from 70 countries and 78,000 visitors from 160 countries.
How much does a MEDICA stand cost?
It depends on the plot, the equipment and the rooms, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
What is the maximum height?
A table by hall sets it: in Hall 6 it reaches 8 m and next to the gallery, 6 m.
Can I build a two-floor stand?
Yes, partly and with the venue consent. Each storey has a minimum clear height of 2.5 m.
When should I start designing?
With months to spare, because two-storey documents are sent six weeks before build-up. See the steps to organise a trade show in advance.
From the Barcelona workshop to the build-up of your MEDICA stand at Messe Düsseldorf
We build the stand in our Barcelona workshop and take it to Messe Düsseldorf. We install and dismantle it ourselves, within the organiser's hours.






