Brands that trust us
What your MATELEC stand needs depending on switchgear, cable, lighting or automation
In 2026 MATELEC runs alongside GENERA as a single event on electrification and decarbonisation. Visitors arrive with a specific technical need, so the stand must show the product and settle their question quickly.
Switchgear and cabinets
Reinforced supports to show them safely, with room to open the door and see the inside.
Cable and components
Sample boards at hand height, with clear references and a counter to check data sheets.
Lighting
Controlled light and darker zones to see the product switched on, with hung luminaires if needed.
Automation and software
Demo stations with a screen and a stable connection, and seats to watch the system working.
Free-design stand build rules at MATELEC 2026 according to IFEMA
The MATELEC 2026 exhibitor guide is public and sets build-up dates, heights, solid walls and second floors. These are the four figures that shape the design most.
See all 10 rules, with their source
| Build-up (free design) | 18 to 21 November 2026: 18 to 20 from 08:30 to 21:30 and 21 from 08:30 to 19:30. Goods and decoration material come in on 22 and 23 November. source |
|---|---|
| Project | Uploaded to the Zona Expo for approval before 18 October 2026, with plan and front and side elevations. It must be approved before you can start building. source |
| Rigging | If the project has elements hung from the ceiling, the hanging points must be booked with the fair and a separate rigging project sent to rigging@ifema.es before 18 October 2026. source |
| Height | 4 m along the perimeter. To raise or hang decorative elements up to 6 m, set back 1 m around the perimeter. Not available in the connection areas between halls or on the entrance sides of Halls 9 and 10. source |
| Overhangs | Construction, decoration and spotlights may not project more than 50 cm beyond the allocated space, and only from 2.5 m high. Spotlights point towards the inside of the stand. source |
| Solid walls | At most 50% of each aisle frontage. Longer closures are set back 3 m and cannot exceed 80% of the frontage length. source |
| Second floor | Up to 7 m in halls, set back 1 m around the perimeter and not allowed in the connection areas or on the entrance sides of Halls 9 and 10. It requires a certificate with dimensions, working load and capacity. source |
| Minimum build | Every company builds at least the party walls with the hall wall and neighbouring stands, and submits the occupational risk protocol. source |
| Safety and access | Hard hat, high-visibility vest and safety footwear are compulsory. No builder passes are needed, but you must pay 100% of the participation, have the project approved, pay the build rights and submit the protocol. source |
| Build rights | The build contractor pays them to IFEMA before starting. There is a 5% discount until 18 October and a 25% surcharge from 11 November 2026. source |
Source: MATELEC 2026 Exhibitor Guide and Specific Participation Rules (IFEMA MADRID, in Spanish), consulted 2026-10-07. Confirm against the current version.
Designing a MATELEC stand with power for demos and technical product on show
Free-design build-up starts on 18 November and the project must be approved before 18 October. So we fix the power, the product supports and the rigging in the first sketch.
Power from the plan
We mark where every board and socket goes for live demos, and book it with IFEMA before we build.
Technical product on show
Cabinets, sample boards and luminaires with calculated supports, so the product can be seen, touched and compared.
Hung lighting
If you hang luminaires or the brand, the rigging project goes to IFEMA separately, before 18 October.
Build-up in four days
We arrive with a prefabricated stand and install between 18 and 21 November, with no improvising in the hall.
Do you have a plot at MATELEC?
Tell us what product you show and how much power you need. We come back with a 3D proposal and a quote.
Portfolio projects that will give you ideas, such as Tyton, TT Cables and FAE
More stand projects in our portfolio.
What makes a MATELEC stand with switchgear and live demos cost more
We do not give figures without seeing your plot: the cost of a MATELEC stand depends on the metres, the power you need and the weight of the product. These are the six factors.
Power for demos
The more equipment running, the more boards, connections and consumption must be planned from the drawing.
Heavy product
Switchgear and cabinets need reinforced structure and supports to be shown safely.
Second floor
It needs a set-back, a structure certificate and more structure, at the cost of usable area.
Rigging
Hanging luminaires or the brand goes through a separate project and booked hanging points.
Build-up window
Hours are fixed. A stand built in the workshop needs fewer hours in the hall.
Reusing the stand
A modular design pays off if you also exhibit at GENERA or another IFEMA show.
At Contemporanea Eventi we design and build your MATELEC stand
Tell us what product you show, how much power you need and whether you also go to GENERA. We come back with a 3D proposal and a quote for your stand at MATELEC.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Frequently asked questions when preparing a stand for MATELEC and GENERA
The questions that come up most when building a free-design stand at IFEMA Madrid, answered with the exhibitor guide, so dates and deadlines are those of the 2026 edition.
When is MATELEC 2026?
On 24-26 November 2026 at IFEMA Madrid, from 09:30 to 18:30, within the International Week of Electrification and Decarbonisation.
Are MATELEC and GENERA the same show?
They are two shows that IFEMA merges in 2026 into one event, the International Week of Electrification and Decarbonisation. They share dates and venue.
How much does a MATELEC stand cost?
It depends on the plot, the power and the product you show, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Can I show heavy switchgear or cabinets?
Yes, with the structure and supports calculated from the project. If you add a second floor, IFEMA asks for a certificate with dimensions, working load and capacity.
Can I hang luminaires or the brand from the ceiling?
Yes, with a separate rigging project sent to IFEMA before 18 October 2026 and hanging points booked with the fair.
When is a free-design stand built?
From 18 to 21 November, with the project approved and the risk protocol submitted. If it is your first show, review the steps to organise a trade show in advance.
Where we install your MATELEC stand inside IFEMA Madrid
We take the finished stand from Barcelona to IFEMA Madrid. We install and dismantle it ourselves, within IFEMA's hours.






