Brands that trust us as their stand builder
What your Key Energy stand needs depending on solar, storage, hydrogen or e-mobility
Per its official website, KEY covers the energy transition chain, from generation to storage and mobility. Visitors are technical, so the stand shows the unit, the data and a place to talk about the project.
Solar and generation
Modules and inverters in view, with a production data panel and a project table.
Storage and batteries
Heavy units with real electrical requirements, shown on a reinforced floor and with protection.
Hydrogen and new technologies
A little-known product, explained with a cutaway model and a short screen of the process.
E-mobility and charging
Charge points that can be approached and used, with power planned from the drawing.
Designing a Key Energy stand with units on show, data on screen and a project zone
Energy transition visitors buy a project, not just equipment. So we show the unit, put the data on a screen and give a place to talk about the installation and the return.
Unit in view
Equipment with real services and a reinforced floor, to be seen and touched safely.
Data on screen
A screen with output, savings or charge cycle, so the value shows without waiting.
Cutaway model
For the little-known, a model or cutaway that explains how it works in a few seconds.
Project zone
A table with drawings and sheets to talk about lead times, power and service.
Planning to exhibit at Key Energy?
Tell us which equipment you present, how much it weighs and what power it needs. We come back with a 3D proposal and a quote.
Real stand projects, like the ones we built for Amador Varas, Sepro and Edwards
More stand projects in our portfolio.
What pushes up the budget of a Key Energy stand with heavy units and its own power
We do not give figures without seeing your plot: the cost of a Key Energy stand depends on the metres, the weight of the units and the power they need. These are the six factors.
Weight of the units
Batteries and large equipment need a reinforced floor, supports and handling by forklift.
Power and connections
Demos with real loads add panels, cabling and coordination with the venue.
Data screens
Every screen with live data adds equipment and a stable connection planned from the drawing.
Project zone
Every table or room adds furniture and reduces the open surface of the stand.
Transport and build-up
Producing in Barcelona means planning transport to Rimini and a short build-up window.
Height and second floor
Going above the general height needs the approval of the organiser and the venue.
At Contemporanea Eventi we design and build your Key Energy stand
Tell us which equipment you present, how much it weighs and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at Key Energy.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at Rimini
Meet the team that designs, builds and installs it.
Questions from Key Energy exhibitors about their stand and build-up in Rimini
The questions that come up most when preparing a stand at the Rimini Expo Centre. The technical rules are given to exhibitors by the organiser, so deadlines and heights are confirmed with them.
When is Key Energy 2027?
On 10-12 March 2027 at the Rimini Expo Centre.
Who organises Key Energy?
Italian Exhibition Group, which holds the show at its own Rimini venue.
How much does a Key Energy stand cost?
It depends on the plot, the weight of the units and the power, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Where are the build rules?
In the technical rules the organiser gives each exhibitor. They are not public, so we ask the client for them before closing the design.
Can I build a two-floor stand?
It depends on the location and on the approval of the organiser and the venue, which set height, documents and deadlines. We confirm it before drawing the second floor.
When should I start designing?
With months to spare, because the show’s rules set their own deadlines. See the steps to organise a trade show in advance.
From the Barcelona workshop to the build-up of your Key Energy stand in Rimini
We build the stand in our Barcelona workshop and take it to Rimini. We install and dismantle it ourselves, within the organiser's hours.






