Brands that trust us
What your INTERAZAR stand needs depending on machines, casino tables, software or distribution
INTERAZAR is, per the IFEMA website, the most relevant meeting of the gaming industry in Spain. The hall holds a lot of light and sound, so the stand must stand out without adding visual noise.
Machines and arcade
A power socket for every machine and space around it so visitors can try it without crowding.
Tables and roulette
Gaming tables with their own light and furniture that shows the product as it works in a venue.
Software and technology
Demo stations with a screen and stable connection, and a calm zone to show the tool.
Distribution and deals
A private room with a door to talk distribution contracts away from the aisle noise.
What IFEMA asks of the free-design stand at INTERAZAR, per its 2026 guides
The INTERAZAR guide is not published yet, so these are the rules of the MATELEC 2026 guide and the SICUR 2026 guide. They will be confirmed with INTERAZAR’s.
See all 8 rules, with their source
| Project | In the 2026 guides, the free-design project is uploaded to the Zona Expo one month before build-up starts, with plan and front and side elevations. source |
|---|---|
| Rigging | If the project has elements hung from the ceiling, the hanging points must be booked with the fair and a separate rigging project sent before that same date. source |
| Height | 4 m along the perimeter. To raise or hang decorative elements up to 6 m, set back 1 m around the perimeter. Not available in the connection areas between halls or on the entrance sides of Halls 9 and 10. source |
| Overhangs | Construction, decoration and spotlights may not project more than 50 cm beyond the allocated space, and only from 2.5 m high. Spotlights point towards the inside of the stand. source |
| Solid walls | At most 50% of each aisle frontage. Longer closures are set back 3 m and cannot exceed 80% of the frontage length. source |
| Second floor | Up to 7 m in halls, set back 1 m around the perimeter and not allowed in the connection areas or on the entrance sides of Halls 9 and 10. A document with dimensions, working load and capacity is required. source |
| Safety and access | Hard hat, high-visibility vest and safety footwear are compulsory during build-up and dismantling. Every company builds at least the party walls with the hall wall and neighbouring stands, and submits the occupational risk protocol. source |
| Build rights | The build contractor pays them to IFEMA before starting. In the 2026 guides, last-minute booking carries a 25% surcharge. source |
Source: MATELEC and SICUR 2026 Exhibitor Guides and Specific Participation Rules (IFEMA MADRID, in Spanish), consulted 2026-10-07. INTERAZAR’s was not available; confirm against it.
Designing an INTERAZAR stand with power for every machine and a room to close deals
In IFEMA’s 2026 guides the project must be approved one month before build-up, so we settle early the power, the machine layout and the meeting room.
Power for every machine
Board, sockets and cable routes planned from the drawing, so each machine works from day one.
Visibility without noise
A clear identity and controlled light, to stand out in a hall full of screens without adding more stimuli.
Accessible machines
Space between machines and seats so visitors try them calmly, without exceeding the frontage limits.
A room for deals
An insulated room, within the frontage closure limit, to talk distribution.
Planning to exhibit at INTERAZAR?
Tell us which machines or technology you bring and how many meetings you expect. We come back with a 3D proposal and a quote.
A sample of our trade show work with FAE, Tyton and TT Cables
More stand projects in our portfolio.
What makes an INTERAZAR stand with many machines and a meeting room cost more
We do not give figures without seeing your plot: the cost of an INTERAZAR stand depends on the metres, the number of machines and the rooms you need. These are the six factors.
Power and cabling
Each machine adds load, a socket and a cable route, and the board is sized for the whole load.
Machines on show
More machines need more surface, platforms or supports and free space around them to be tried.
Own lighting
Careful light to stand out among screens adds installation and control throughout the show.
Deal room
Every private room adds structure and insulation, and must respect the frontage closure limit.
Height and rigging
Raising the brand needs a set-back and, if hung, a project approved in time.
Reusing the stand
A modular design pays off if you return to INTERAZAR or take the stand to another gaming show.
At Contemporanea Eventi we design and build your INTERAZAR stand
Tell us which machines or technology you bring, how much power you need and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at INTERAZAR.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Frequently asked questions from INTERAZAR exhibitors, formerly FIJMA
The questions that come up most when preparing a free-design stand at IFEMA Madrid. The rules cited are those of IFEMA’s 2026 guides, until the INTERAZAR 2027 one is out.
Is INTERAZAR the same show as FIJMA?
Yes: INTERAZAR is the current name of the former International Gaming Fair, with 47 years of history per the organiser.
When is INTERAZAR 2027?
On 16-17 March 2027 at IFEMA Madrid, and for the first time in Hall 12, per the organiser.
How much does a INTERAZAR stand cost?
It depends on the plot, the number of machines and the rooms, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Can you supply power to all the machines?
Yes: we calculate each machine’s consumption from the drawing and size the board and sockets before building.
Can I close my stand with walls?
Up to 50% of each aisle frontage. To close more, set it back 3 m and do not exceed 80% of the frontage.
When should I start designing?
With months to spare: in the 2026 guides the project is approved one month before build-up. See the steps to organise a trade show in advance.
How we install your INTERAZAR stand in the IFEMA hall
We take the finished stand from Barcelona to IFEMA Madrid. We install and dismantle it ourselves, within IFEMA's hours.






