Brands that trust us
A FITUR stand depending on whether you are a destination, hotel, agency or travel-tech company
FITUR brings together public bodies, hotels, agencies, tour operators and travel technology. Professional visitors come from Wednesday to Friday and the weekend opens to the public, so the stand works two shifts.
Destinations and public bodies
Modules that can be split among municipalities and companies, an events area and a message recognisable from afar.
Hotels and accommodation
Allocations and rates get negotiated: a reserved table and a meeting room away from aisle noise.
Agencies and tour operators
Product with clear screens and maps, and a counter where people are served without queuing.
Travel technology
Demo stations with a screen, connection and seat, to see it working calmly.
Free-design stand build rules at FITUR 2027 according to IFEMA
The FITUR 2027 exhibitor guide is public and sets build dates, heights, closures and second floors. These are the four figures that shape the design most.
See all 9 rules, with their source
| Build-up (free design) | Halls 1 to 10: 13, 14, 15 and 18 January from 06:30 to 21:30, and 16 and 17 January from 06:30 to 19:30. Hall 12: 16 and 17 January from 06:30 to 19:30 and 18 January from 06:30 to 21:30. source |
|---|---|
| Project | Uploaded to the Zona Expo for approval before 13 December 2026. If it includes rigging, the request in IFEMA’s Shop has the same date. source |
| Height | 4 m along the perimeter. To raise or hang decorative elements up to 6 m, set back 1 m around the perimeter. Not available in the connection areas between halls or on the entrance sides of Halls 9 and 10. source |
| Overhangs | Construction, decoration and spotlights may not project more than 50 cm beyond the allocated space, and only from 2.5 m high. source |
| Solid walls | At most 50% of each aisle frontage. Longer closures are set back 3 m and cannot exceed 80% of the frontage length. source |
| Second floor | Up to 7 m in halls, set back 1 m around the perimeter and not allowed in the connection areas or on the entrance sides of Halls 9 and 10. A structure document with dimensions, working load and capacity must be presented during build-up. source |
| Minimum build | Every company builds at least the party walls with the hall wall and with neighbouring stands. source |
| Safety | Hard hat, high-visibility vest and safety footwear are compulsory during build-up and dismantling. There are no builder passes, and the risk prevention protocol is sent to IFEMA before starting. source |
| Carpet and aisles | The aisle strip without carpet belongs to the aisle and may not be covered or decorated. The build contractor pays IFEMA the build rights before starting and manages its own waste. source |
Source: FITUR 2027 Exhibitor Guide and Specific Participation Rules (IFEMA MADRID, in Spanish), consulted 2026-10-07. Confirm against the current version.
Designing your FITUR stand around IFEMA’s regulations
Free-design build-up starts on 13 January with fixed hours and the project must be in the Zona Expo before 13 December. That is why we settle it in the first sketch.
A prefabricated stand
Build-up has fixed hours. We build in Barcelona; in Madrid it is only assembled.
A front that is not a wall
Solid closures cannot exceed 50% of each frontage. Open fronts, glass and furniture that closes without blocking.
Brand up high
Height along the perimeter is limited, but the brand can hang higher if set back 1 m.
Second floor with paperwork
With its own maximum height and the structure documentation at build-up. We prepare it from the project.
Have a plot at FITUR?
Tell us whether you represent a destination, a hotel or a company. We come back with a 3D proposal and a quote.
How our stands look at shows, for example those for Blue Diamond & Nexus, FAE and Tyton
More stand projects in our portfolio.
How each decision weighs on the budget of a FITUR stand
We do not give figures without seeing your plot: the cost of a FITUR stand depends on the metres, the second floor and the meeting rooms. These are the six factors.
Second floor
It needs a heavier structure, the structure documentation at build-up and set-back area that cannot be used.
Rigging
Hanging the brand goes through a request to IFEMA with a deadline.
Set-backs
Raising decoration or closing more frontage forces set-backs and changes the interior layout.
Meeting rooms
Every room adds structure and insulation, and must respect the frontage closure limit.
Build-up in a short window
Build-up hours are fixed. A stand built in advance needs fewer hours in the hall.
Reusing the stand
A modular design spreads the cost across editions if you return to FITUR or go to another show.
At Contemporanea Eventi we help you with your FITUR stand
Tell us your plot, how many meetings you expect and whether you represent a destination, a hotel or a company. We come back with a 3D proposal and a quote for your FITUR stand.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Common questions from FITUR 2027 exhibitors
The questions that come up most when preparing a free-design stand at IFEMA Madrid, answered from the exhibitor guide, so dates and deadlines are that edition’s.
When is FITUR 2027?
20-24 January 2027 at IFEMA Madrid. It opens Wednesday to Friday 10:00 to 19:00, Saturday 10:00 to 20:00 and Sunday 10:00 to 18:00.
Can I build my own stand?
Yes. IFEMA offers turnkey stands and also space-only with free design, where the exhibitor commissions their own stand. That is where we work.
How much does a stand for FITUR cost?
It depends on the plot, the second floor and the meeting rooms, so we give no figure without seeing the plan. To get oriented on the line items, see how to calculate the budget for a trade-fair stand.
Can I build a two-storey stand?
Yes, up to 7 m in halls, with the upper floor set back 1 m. Not in the connection areas or on the entrance sides of Halls 9 and 10.
Can I close my stand with walls?
Up to 50% of each aisle frontage; to close more, the wall must be set back 3 m and not exceed 80% of the frontage.
When does build-up start and what do I need?
From 13 January in Halls 1 to 10. Hard hat, vest and safety footwear, and the risk prevention protocol sent first. If it is your first show, review the steps to organise a trade fair in advance.
Stand build and dismantle at IFEMA Madrid
We bring the stand already built from Barcelona to IFEMA Madrid. We install and dismantle it ourselves, within IFEMA's hours.






