Brands that trust us as their stand builder
What your Expodental stand needs depending on manufacturing, distribution or dental technology
Expodental brings together dentists, hygienists, prosthetists and clinical teams. They come to see equipment working and to decide a purchase, so the stand needs clear demos and a place to talk terms.
Equipment makers
A demo zone with a chair or unit in use, with power and services planned from the drawing.
Distributors
Many brands under one roof: tidy showcases, product on view and a counter for orders.
Digital technology
Scanners and digital design and manufacturing on demo stations with a big screen and a stable connection.
Training
A small seated audience for short sessions, to one side of the stand and with controlled sound.
What IFEMA requires for the free-design stand at Expodental, per its latest guides
The Expodental guide is not published yet, so these are the rules of the MATELEC 2026 guide and the SICUR 2026 guide. They will be confirmed with Expodental’s.
See all 8 rules, with their source
| Project | In the 2026 guides, the free-design project is uploaded to the Zona Expo one month before build-up starts, with plan and front and side elevations. source |
|---|---|
| Rigging | If the project has elements hung from the ceiling, the hanging points must be booked with the fair and a separate rigging project sent before that same date. source |
| Height | 4 m along the perimeter. To raise or hang decorative elements up to 6 m, set back 1 m around the perimeter. Not available in the connection areas between halls or on the entrance sides of Halls 9 and 10. source |
| Overhangs | Construction, decoration and spotlights may not project more than 50 cm beyond the allocated space, and only from 2.5 m high. Spotlights point towards the inside of the stand. source |
| Solid walls | At most 50% of each aisle frontage. Longer closures are set back 3 m and cannot exceed 80% of the frontage length. source |
| Second floor | Up to 7 m in halls, set back 1 m around the perimeter and not allowed in the connection areas or on the entrance sides of Halls 9 and 10. A document with dimensions, working load and capacity is required. source |
| Safety and access | Hard hat, high-visibility vest and safety footwear are compulsory during build-up and dismantling. Every company builds at least the party walls with the hall wall and neighbouring stands, and submits the occupational risk protocol. source |
| Build rights | The build contractor pays them to IFEMA before starting. In the 2026 guides, last-minute booking carries a 25% surcharge. source |
Source: MATELEC and SICUR 2026 Exhibitor Guides and Specific Participation Rules (IFEMA MADRID, in Spanish), consulted 2026-10-07. Expodental’s was not available; confirm against it.
Designing an Expodental stand with equipment demos, a chair and a training area
In IFEMA’s 2026 guides the project must be approved one month before build-up, so we settle early where the demo, the training and the meeting room go.
Demo with services
The chair or demo unit with power, water and drainage planned from the drawing, not improvised.
Product at hand height
Showcases and displays where the professional sees and touches, with the data sheet next to it.
Room to train
A seating zone that opens to the aisle without hiding the demo, for short sessions with the team.
Meeting room
An insulated room to close purchases, within the frontage closure limit.
Planning to exhibit at Expodental?
Tell us what equipment you demonstrate and how much training you want to offer. We come back with a 3D proposal and a quote.
Trade show stands that came out of our workshop, such as those for FAE, Tyton and TT Cables
More stand projects in our portfolio.
What weighs on the budget of an Expodental stand with equipment demos
We do not give figures without seeing your plot: the cost of an Expodental stand depends on the metres, the equipment demonstrated and the training area. These are the six factors.
Equipment in use
A chair or demo unit needs power, water and drainage planned from the drawing.
Showcases and product
Small, valuable product is shown in lit showcases, which add fabrication.
Digital stations
Scanners and screens need a stable connection and a calm demo area.
Training area
A seated audience needs surface, controlled sound and a layout that does not hide the rest.
Height and rigging
Raising the brand needs a set-back and, if hung, a rigging project approved in time.
Reusing the stand
A modular design pays off because Expodental is biennial and between editions you can go to other shows.
At Contemporanea Eventi we design and build your Expodental stand
Tell us what equipment you demonstrate, how much training you want to give and how many meetings you expect. We come back with a 3D proposal and a quote for your stand at Expodental.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Questions to settle before preparing your Expodental 2028 stand
The questions that come up most when preparing a free-design stand at IFEMA Madrid. The rules cited are those of IFEMA’s 2026 guides, until the Expodental 2028 one is out.
When is Expodental 2028?
On 22-24 March 2028 at IFEMA Madrid. The previous edition ran on 11-13 March 2026.
How often is Expodental held?
Every two years: after the 2026 edition, IFEMA calls the next one for 2028, the 19th counting the previous 18.
How much does a Expodental stand cost?
It depends on the plot, the equipment you demonstrate and the training area, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Can I build a two-floor stand?
Yes, up to 7 m in halls, with the upper floor set back 1 m. Not in the connection areas or on the sides of Halls 9 and 10.
Can I close my stand with walls?
Up to 50% of each aisle frontage. To close more, set it back 3 m and do not exceed 80% of the frontage.
When should I start designing?
With months to spare: in the 2026 guides the project is approved one month before build-up. See the steps to organise a trade show in advance.
How we install your Expodental stand at IFEMA Madrid
We take the finished stand from Barcelona to IFEMA Madrid. We install and dismantle it ourselves, within IFEMA's hours.






