Brands that trust us as their stand builder
What your ESMO stand needs depending on whether you are pharma, diagnostics, digital health or a patient group
Per the congress website, ESMO gathers doctors, researchers, patients and health companies. A conversation about trial data or a drug’s safety should not be overheard by a competitor, so the stand is private rooms more than displays.
Pharma and clinical data
Insulated rooms to talk results without being heard outside, with a table and clear capacity.
Diagnostics and medical imaging
An imaging demo needs a controlled environment and often its own power.
Digital health and AI in oncology
The product is a screen, a dashboard and a conversation about how an algorithm reads.
Patients and non-profits
Here the tone is warmer and less corporate: an open, welcoming, well-signed space.
Designing an ESMO stand with private rooms, a demo zone and an open welcome space
At an oncology congress the conversation is what matters. So we design rooms to talk in privacy, a demo zone with services and an open front that invites people in.
Insulated rooms
Rooms with clear capacity and good acoustic insulation, to talk data with confidence.
Demo zone
Equipment or screens with power and connection planned from the drawing.
Open front
A welcoming, well-signed entrance that does not force people through a barrier.
Regulatory frame
A design that respects the congress and venue exhibition rules from the first drawing.
Planning to exhibit at ESMO?
Tell us which product or service you present. We come back with a 3D proposal and a quote, and if the lead time is very short, we tell you what is feasible.
Trade show stands that came out of our workshop, such as those for R-Pharm, SeedCare & Biologicals Institute and Semsum
More stand projects in our portfolio.
What pushes up the budget of an ESMO stand with private rooms and demos
We do not give figures without seeing your plot: the cost of an ESMO stand depends on the metres, the rooms and the demos. These are the six factors.
Private rooms
Every insulated room adds structure and reduces the open surface of the stand.
Imaging and data demos
Screens and equipment add power, cabling and a stable connection planned from the drawing.
Quality finishes
A careful, sober finish adds fabrication and build-up time.
Welcome zone
An open front with a counter adds furniture and orientation graphics.
Production lead time
The less margin, the more limited what can be fabricated and the narrower the choice of finishes.
Height and second floor
Going above the general height needs the approval of the organiser and the venue.
At Contemporanea Eventi we design and build your ESMO stand
Tell us which product or service you present, how many rooms you need and what plot you have. We come back with a 3D proposal and a quote for your stand at ESMO.
- 3D proposal with a quote
- Built in our Barcelona workshop
- Installed and dismantled by our crew at IFEMA Madrid
Meet the team that designs, builds and installs it.
Questions from ESMO exhibitors about their stand and build-up at IFEMA Madrid
The questions that come up most when preparing a stand at IFEMA. The technical rules are given to exhibitors by the organiser, so deadlines and heights are confirmed with them.
When is ESMO 2026?
On 23-27 October 2026 at IFEMA Madrid.
Am I in time for ESMO 2026?
With so little margin only a modular solution or an adapted catalogue stand is feasible; if you already have a plot, tell us as soon as you can and we will say what is possible.
How much does a ESMO stand cost?
It depends on the plot, the rooms and the demos, so we give no figure without the plan. To orient yourself on the items, see how to calculate a trade show stand budget.
Where are the build rules?
In the technical rules the organiser gives each exhibitor. They are not public, so we ask the client for them before closing the design.
Can I build a two-floor stand?
It depends on the location and on the approval of the organiser and the venue, which set height, documents and deadlines. We confirm it before drawing the second floor.
When should I start designing?
With months to spare, because the congress rules set their own deadlines. See the steps to organise a trade show in advance.
Production in Barcelona and build-up of your ESMO stand at IFEMA Madrid
We build the stand in our Barcelona workshop and take it to IFEMA Madrid. We install and dismantle it ourselves, within the organiser's hours.





